Vandalia Leader

Follow Us On:

MoDOT Weekly Report

Posted on Wednesday, January 18, 2012 at 9:13 am

—Schedule for January 17-27

Audrain County
Maintenance:
Various Routes – filling potholes; moving operation with short term one lane traffic with cautionary signs.
Various Routes – driveway and shoulder work; moving operation with cautionary signs and flaggers.
Various Routes – cutting brush under bridges and around culvert ends; moving operation with cautionary signs.
Route K – bridge deck repair; one lane traffic with cautionary signs and flaggers.
Pike County
Maintenance:.
Route 61 – Jan. 17-20 fill potholes; moving operation with cautionary signs.
Various Routes – Jan. 17-20 sign work in old Louisiana area; moving operation.
Routes J and Z – Jan. 17-20 repair driveway entrances; cautionary signs.
Various Routes – fill potholes and other road repair work in various locations; watch for cautionary signs and trucks in the work zones.
Various Routes – shoulder and edge repairs in various locations on minor routes; watch for cautionary signs and trucks in the work zones.
Various Routes – cutting brush; all lanes open to traffic.
Route Y – Jan. 23-27 culvert replacement and dirt work; one lane traffic with cautionary signs and flaggers.
Various Routes – Jan. 23-27 blade outer roads; moving operation.
Various Routes – pothole patching and other road repair work in various locations; cautionary signs and trucks.
Various Routes – shoulder and edge repairs in various locations on minor routes; cautionary signs and trucks.
Ralls County
Maintenance:
Routes 19, EE, J & BB – Jan. 17-20 repair driveway entrances and mailbox approaches and work on shoulders; moving operation with cautionary signs and flaggers.
Routes A and HH – Jan. 17-20 grade and repair county road entrances and work on shoulders; possible short term traffic interruptions.
Routes J, BB and W – Jan. 23-27  grade and repair driveway entrances and mailbox approaches and shoulder work
Routes A, HH & DD – Jan. 23-27 grade and repair county road entrances and work on shoulders; possible short term traffic interruptions.
Various Routes – cut and remove brush; one lane closure with flagmen, 7:30 a.m. – 3:00 p.m
Various Routes – filling potholes; moving operation with cautionary signs.