Schedule for July 23- August 3, 2012
Audrain County
Construction
Route JJ – Resurface from US 54 at Mexico to the end of state maintenance; scheduled to begin in September; estimated completion: Summer 2012
Route B – Resurface from US 54 through Rush Hill to Route J; scheduled to begin in September; estimated completion: Summer 2012
Route KK – Resurface from MO 19 at Laddonia to Route B north of Rush Hill; scheduled to begin in September; estimated completion: Summer 2012
MO 19 – Resurface from US 61 near New London to just north of Laddonia at Route J, 27 miles; job has not been scheduled; estimated completion: Summer 2012
Maintenance
Route ZZ – July 23 road closed 7 a.m. – 4 p.m. for culvert replacements between County Roads 384 and 343, and CR 353 & Rte. Z; alternate routes must be used during these times.
Route ZZ – July 24 road closed 7 a.m. – 4 p.m. for culvert replacements between County Road 353 and Route Z; alternate routes must be used during these times.
Route Z – July 24-25 road closed 7 a.m. – 4 p.m. for culvert replacements between Audrain County Road 364 and MO 15; alternate routes must be used during these times.
Route M – July 23-25 one lane traffic from 7 a.m. – 3:30 p.m. for pavement repairs from at various locations from Route D to Route FF west of Mexico.
Route HH – July 26-31 one lane traffic from 7 a.m. – 3:30 p.m. for pavement repairs from at various locations from US 54 south of Mexico to Route M.
Route C – July 30 one lane traffic from 7 a.m. – 4 p.m. for pavement repairs from at various locations from MO 151 north of Centralia to Route CC.
Route CC – July 31 one lane traffic from 7 a.m. – 4 p.m. for pavement repairs from at various locations from Route C to MO 15.
Route D – July 31-Aug. 2 one lane traffic from 7 a.m. – 3:30 p.m. for pavement repairs from at various locations from Route Z to US 54.
Various Routes – July 23-Aug. 2 pothole patching; short duration one lane traffic with flaggers from 7 a.m. to 4 p.m. at various locations.
Various Routes – July 23-Aug. 2 sign maintenance and repairs at various locations; shoulder work with little or no impact to traffic.
Various Routes – July 23-Aug. 2 mowing along shoulders on all minor routes; one lane traffic with blocker truck protecting work zone.
Pike County
Construction
US 54 – ROAD CLOSED for Safe and Sound Bridge Replacement at Noix Creek between Bowling Green and Louisiana; Recommended Commercial Vehicle Detour – US 54, MO 79 south, Route B west, US 61 North or South; Recommended Local and Tourism Detour – US 54, Route UU, US 61 North or South; 89% complete; Pouring approach slab and barrier wall; Estimated completion: August 7, 2012
US 54 – ROAD CLOSED for Safe and Sound Bridge Replacement at Noix Creek between Bowling Green and Louisiana -Recommended Commercial Vehicle Detour – US 54, MO 79 south, Route B west, US 61 North or South; Recommended Local and Tourism Detour – US 54, Route UU, US 61 North or South;50% complete; tying steel and bridge deck pour; Estimated completion August 4, 2012
MO 79 – Seal coat from Ralls County line to Route TT near Ashburn; not scheduled; estimated completion: Summer 2012
US 61 – Pavement repair and resurfacing north and southbound lanes from just north of Route OO to Route B; tentatively scheduled to begin pavement repair in the northbound lanes August 1; one lane traffic during working hours; estimated completion: July 2012
Maintenance
Route V – July 25-26 one lane traffic from 7 a.m. – 4 p.m. for pavement repairs at various locations from Route M south of Curryville to Route W at Vandalia.
Route M – July 26 one lane traffic from noon – 4 p.m. for pavement repairs at various locations from US 54 at Curryville to MO 161 north of Middletown.
Route Y – July 30 one lane traffic from 7 a.m. – noon for pavement repairs at various locations from Bus. Route 61 at Bowling Green to the end of State Maintenance.
Route E – July 30 one lane traffic from 1 p.m. – 4 p.m. for pavement repairs at various locations from US 54 at Curryville to Route C near Frankford.
Route C – July 31 one lane traffic from 7 a.m. – 4 p.m. for pavement repairs at various locations from US 61 at Frankford to Route F in Ralls County.
Various Routes – repairing potholes and bridge work; short duration one lane traffic with flaggers from 7 a.m. to 4 p.m. at various locations.
Various Routes – July 23- Aug. 2 mowing shoulders; blocker truck protecting work zone.
Various Minor Routes – July 30-Aug. 2 striping; moving operation with one lane traffic with blocker truck protecting work zone, watch for wet paint.
Ralls County
Construction
MO 19 – Resurface from US 61 near New London to just north of Laddonia at Route J, 27 miles; job has not been scheduled; estimated completion: Summer 2012.
Route T – Resurface from just south of MO 79 to Route N south of Hannibal; job has been postponed; estimated completion: Summer 2012
MO 154 – Resurface from MO 19 to US 54 near Hutchison between Curryville and Vandalia; job not scheduled; estimated completion: Summer 2012
Route E – Seal coat from MO 79 to end of State maintenance near Saverton; not scheduled; estimated completion: Summer 2012
Route T – Seal coat from Route N south of Hannibal to MO 79 near Ashburn; not scheduled; estimated completion: Summer 2012
Route V – Seal coat from Ralls Street in New London to Route T; not scheduled; estimated completion: Summer 2012
Route N – Seal coat from Route T to MO 79 near Saverton; not scheduled; estimated completion: Summer 2012
Maintenance
Route F – July 23 one lane traffic 7 a.m. – 4:30 p.m. for pavement repairs from MO 19 to US 54.
Route 154 – July 23 one lane traffic 7 a.m. – 4:30 p.m. for pavement repairs from US 54 to MO 19.
Routes W & J – July 23-26 shoulder repairs; moving operation with one lane traffic with blocker truck protecting work zone from 7 a.m. – 4:30 p.m.
Route D – July 24-25 road closed 7 a.m. to 4:30 p.m. for pavement repairs, resurfacing and sealing operations from MO 19 to Route B.
Route ZZ – July 26 road closed 7 a.m. – 4:30 p.m. for pavement repairs from US 61 to the end of State Maintenance.
Route 61 Outer Roads – July 30-31 one lane traffic 7 a.m. – 4:30 p.m. for pavement repairs from various locations from Hannibal to Frankford.
MO 154 – July 30-Aug. 2 shoulder repairs; moving operation with one lane traffic with blocker truck protecting work zone from 7 a.m. – 4:30 p.m.