Route JJ – Resurface from US 54 at Mexico to the end of state maintenance; scheduled to begin in June; estimated completion: Summer 2012
Route B – Resurface from US 54 through Rush Hill to Route J; scheduled to begin in June; estimated completion: Summer 2012
Route KK – Resurface from MO 19 at Laddonia to Route B north of Rush Hill scheduled to begin in June; estimated completion: Summer 2012
MO 19 – Resurface from US 61 near New London to just north of Laddonia at Route J, 27 miles; job has not been scheduled; estimated completion: Summer 2012
Maintenance
US 54 Outer Roads – May 29-June 8 grading on gravel outers roads; moving operation with short duration one lane traffic.
Various Minor Routes – May 29-June 8 culvert replacements and ditch work; one lane traffic with flaggers at the work zone.
Various Routes – May 29 – June 8 pothole patching; short duration one lane traffic with blocker truck protecting work zone.
Various Routes – May 29-June 8 sign repairs along shoulders; one lane traffic with blocker truck protecting work zone.

Pike County
Construction
Route D – ROAD CLOSED for Safe and Sound Bridge replacement at Little Calumet Creek just south of Route N near Calumet; detour over MO 79 and Routes N, W and WW; 20% complete; contractor plans to work on end bents  and pour caps at intermediate bents; Estimated completion: June 27, 2012
US 54 – Safe and Sound Bridge Replacement at Noix Creek between Bowling Green and Louisiana – Bridge to close June 18, 2012 for 50 days; Commercial Vehicle Detour – Recommended Detour Routes over US 54, MO 79 south, Route B west, US 61 North or South; Local and Tourism Detour – Recommended Detour Routes over US 54, Route UU, US 61 North or South; Estimated completion: August 7, 2012
US 54 – Safe and Sound Bridge Replacement at Noix Creek between Bowling Green and Louisiana – Bridge to close June 25, 2012 for 40 days; Commercial Vehicle Detour – Recommended Detour Routes over US 54, MO 79 south, Route B west, US 61 North or South; Local and Tourism Detour – Recommended Detour Routes over US 54, Route UU, US 61 North or South
MO 79 – Seal coat from Ralls County line to Route TT near Ashburn; work scheduled to begin this month; estimated completion: Summer 2012
Route Z – Seal coat from Route 161 to US 61 in Pike and Lincoln Counties; project scheduled to begin June 6-13; estimated completion: Summer 2012
Route H – Seal coat from Route W south junction to MO 79; project scheduled to begin June 5; one lane traffic in the work zone; estimated completion: Summer 2012
US 61 – Pavement repair and resurfacing north and southbound lanes from just north of Route OO to Route B; scheduled to begin June 12; one lane traffic during working hours; estimated completion: July 2012
Maintenance
Route O – June 6 traffic reduced to one lane for pavement repairs from 6:30 a.m. to 5 p.m. at various locations from MO 161 south of New Hartford to Route E at Olney in Lincoln County.
Various Routes – May 29 – June 8 pothole patching; short duration one lane traffic with blocker truck protecting work zone.
Various Minor Routes – May 29-June 8 mowing along shoulders on all minor routes; one lane traffic with blocker truck protecting work zone.
Various Routes – May 29-June 8 spraying herbicide for weed control along shoulders; one lane traffic with blocker truck protecting work zone.

Ralls County
Construction
MO 19 – Resurface from US 61 near New London to just north of Laddonia at Route J, 27 miles; job has not been scheduled; estimated completion: Summer 2012.
Route T – Resurface from just south of MO 79 to Route N south of Hannibal; contractor tentatively plans to begin work June 1, 2012; estimated completion: Summer 2012
MO 154 – Resurface from MO 19 to US 54 near Hutchison between Curryville and Vandalia; scheduled to begin in June; estimated completion: Summer 2012
Route E – Seal coat from MO 79 to end of State maintenance near Saverton; work scheduled to begin after May 1; estimated completion: Summer 2012
Route T – Seal coat from Route N south of Hannibal to MO 79 near Ashburn; tentative start date June 1; estimated completion: Summer 2012
Route V – Seal coat from Ralls Street in New London to Route T; work tentatively scheduled to begin after May 1; estimated completion: Summer 2012
Route N – Seal coat from Route T to MO 79 near Saverton; work tentatively scheduled to begin after May 1; estimated completion: Summer 2012
Maintenance
Various Routes – May 29 – June 8 pothole patching; short duration one lane traffic with blocker truck protecting work zone.