Vandalia Leader

Follow Us On:

MoDOT Weekly Report

Posted on Wednesday, January 4, 2012 at 1:52 am

Schedule for January 3-13

Audrain County
Maintenance:
Route BB –  dirt work and clearing ditches, moving operation with cautionary signs.
Various Routes – filling potholes, moving operation with short term one lane traffic.
Various Routes – shoulder work, moving operation with cautionary signs and flaggers.
Various Routes – dirt work and clearing ditches, moving operation with cautionary signs.
Various Routes – cutting brush, all lanes open to traffic.
Pike County
Maintenance:.
Route TT – culvert replacement; possible short term traffic interruptions.
Routes U, YY, AD and 79 – driveway approach work; one lane traffic with cautionary signs and flaggers at the work zone.
Various Routes – culvert inspections; all lanes open to traffic.
Various Routes – filling potholes, moving operation with cautionary signs.
Various Routes – sign work, possible short-term traffic interruptions.
Various Routes – Jan. 9-13 dirt work and clearing ditches, moving operation with cautionary signs at work zone.
Various Routes – Jan. 9-13 cutting brush; one lane traffic with flaggers from 7:30 a.m. to 3:00 p.m.
Various Routes -Jan. 9-13 shoulder and edge repairs in various locations on minor routes.
Ralls County
Maintenance:
Routes 61, 24 and 36 –  delineator repair; moving operation with cautionary signs.
Route 79 – guardrail repair; moving operation with cautionary signs.
Various Routes – clearing brush; one lane closure with flaggers, 7:30 a.m. – 3:00 p.m.
Various Routes –  culvert inspections; all lanes open to traffic.
Various Routes – grade and repair driveway entrances and mailbox approaches; possible short term traffic interruptions.
Various Routes – filling potholes; moving operation with cautionary signs.
Various Routes – Jan. 9-13 sign work; possible short-term traffic interruptions.
Routes 61 and 36 – Jan. 9-13 driveway approach work; one lane traffic with cautionary signs and flaggers at the work zone.