MoDOT Maintenance

Schedule for April 22-May 3
Audrain County
Maintenance
MO 15/22 (Muldrow Street) – April 22-26 one lane traffic with 10 ft. width restriction 7 a.m. – 4 p.m. between Promenade and Quisenberry Streets in Mexico for pavement repair
Various Routes – April 22-May 3 possible intermittent lane closures or slow moving vehicles blocking driving lane for surface and/or roadside maintenance operations in various locations.

Pike County
Construction
US 61 – Rehabilitate pavement on northbound and southbound lanes from just south of New London to just south of Route UU at Bowling Green, 11.92 miles Project 5% complete- asphalt operations in SB lane, one lane traffic through work zone; Estimated Completion: Summer 2013; Hannibal Project Office
Maintenance
US 54- April 22-25 one lane traffic with 9-foot width restriction 7 a.m. – 4 p.m. for expansion joint repair on the Champ Clark Bridge at Louisiana
Route M – April 22 one lane traffic from 8 a.m. to 3 p.m. for shoulder work approximately 5 miles south of US 54.
Various Routes – April 22-May 3 possible intermittent lane closures or slow moving vehicles blocking driving lane for surface and/or roadside maintenance operations in various locations.

Ralls County
Construction
Route J – Preventative maintenance on Mark Twain Lake bridges over the Cannon Reservoir and Lick Creek. Work involves substructure repairs and modifications, expansion joint replacement, removal and replacement of asphalt surface and upgrading the existing guardrail. Each bridge will be closed for 20-30 days once the structural work begins with some lane closures for surface work. Full bridge closures will not take place between Memorial and Labor Day due to tourism and recreational use of the lake. 0% complete – Project inactive, schedule pending; Estimated Completion: Fall 2013; Macon Project Office

Posted on Thursday, April 25, 2013 at 10:37 am