MoDOT maintanence for northeast Missouri

Posted on Wednesday, March 13, 2013 at 10:43 am

The following is a list of general highway construction and maintenance scheduled for March 11-22 in MoDOT’s northeast district.
Audrain County
Maintenance
Various Routes – March 11-22 possible intermittent lane closures or slow moving vehicles blocking driving lane for surface and/or roadside maintenance operations in various locations.
Monroe County
Construction
MO 154 – Preventative maintenance on Mark Twain Lake bridges over Elk Fork Salt River and South Fork Salt River. Work involves substructure repairs and modifications, expansion joint replacement, removal and replacement of asphalt surface and upgrading the existing guardrail. Each bridge will be closed for 20-30 days once the structural work begins with some lane closures for surface work. Full bridge closures will not take place between Memorial Day and Labor day due to tourism and recreational use of the lake. Project inactive; Estimated Completion: Fall 2013; Macon Project Office
Monroe County
Maintenance
Various Routes – March 11-22 possible intermittent lane closures or slow moving vehicles blocking driving lane for surface and/or roadside maintenance operations in various locations.
Pike County
Construction
MO 79 – Bridge replacement over Little Calumet Creek; Project inactive; Estimated Completion: Fall 2013; Troy Project Office
US 61 – Rehabilitate pavement on northbound and southbound lanes from just south of New London to just south of Route UU at Bowling Green, 11.92 miles Project inactive; Estimated Completion: Summer 2013; Hannibal Project Office
Pike County
Maintenance
Various Routes – March 11-22 possible intermittent lane closures or slow moving vehicles blocking driving lane for surface and/or roadside maintenance operations in various locations.
Ralls County
Construction
MO 79 – Pavement and shoulder improvements from Third Street Overpass in Marion County to Route E and N junction near Saverton; Project inactive; Estimated Completion: Fall 2013; Hannibal Project Office
Route J – Preventative maintenance on Mark Twain Lake bridges over the Cannon Reservoir and Lick Creek. Work involves substructure repairs and modifications, expansion joint replacement, removal and replacement of asphalt surface and upgrading the existing guardrail. Each bridge will be closed for 20-30 days once the structural work begins with some lane closures for surface work. Full bridge closures will not take place between Memorial and Labor Day due to tourism and recreational use of the lake. Project inactive; Estimated Completion: Fall 2013; Macon Project Office
Ralls County
Maintenance
US 61 – Sunday, March 10 intermittent stopping of all lanes of traffic for 10 to 15 minutes at various intervals between 10 and 11:30 a.m. for cable installation. At approximately 10 a.m., crews will begin installing cable across the northbound lanes with traffic stopped for approximately 10 to 15 minutes near Grand View Nursing Home and Burial Park and Selby Implement. Beginning at about 10:45 a.m. crews will close the southbound lanes just south of Warren Barrett Drive and Red Devil Road for an additional 10 to 15 minutes
Various Routes – March 11-22 possible intermittent lane closures or slow moving vehicles blocking driving lane for surface and/or roadside maintenance operations in various locations.

Headlines of the Day