Resurfacing

Weather permitting, within the next couple of weeks, MoDOT and its contractor, W. L. Miller Company, will begin work to resurface the following routes listed below in Audrain and Ralls Counties.
Route JJ in Audrain County – Resurfacing from US 54 at Mexico to the end of state maintenance.
Route B in Audrain County – Resurfacing from US 54 through Rush Hill to Route J.
Route KK in Audrain County – Resurfacing from MO 19 at Laddonia to Route B north of Rush Hill.
MO 154 in Ralls County – Resurfacing from MO 19 to US 54 near Hutchison between Curryville and Vandalia.
Traffic will be reduced to one lane through the work zone with flaggers controlling traffic. Signs will be in place to alert motorists fresh oil and loose rock chips may be present at various locations along the roadway. Construction equipment will be entering and exiting the work zone. Some delays should be expected; motorists are urged to use alternate routes during these times.
Please use extra caution if you must travel through the work zone area. All lanes will be open to traffic at the end of each workday.

Posted on Wednesday, September 12, 2012 at 9:02 am