MoDOT Weekly Report

Schedule for August 13-24, 2012
Audrain County
Construction
Route JJ – Resurface from US 54 at Mexico to the end of state maintenance; inactive ; Estimated completion: Summer 2012
Route B – Resurface from US 54 through Rush Hill to Route J; inactive; Estimated completion: Summer 2012
Route KK – Resurface from MO 19 at Laddonia to Route B north of Rush Hill; inactive; Estimated completion: Summer 2012
MO 19 – Resurface from US 61 near New London to just north of Laddonia at Route J; scheduled to begin Aug. 6; contractor will be performing coldmilling operations for bonded concrete intersection at Rte. 19 & Rte. H/P in Center; Estimated completion: Summer 2012
Maintenance
Various Routes – Aug. 13-24 possible intermittent lane closures or slow moving vehicles blocking driving lane for surface and/or roadside maintenance operations in various locations
Pike County
Construction
US 54 – OPEN TO TRAFFIC at Noix Creek between Bowling Green and Louisiana
US 54 – OPEN TO TRAFFIC at Noix Creek between Bowling Green
MO 79 – Seal coat from Ralls County line to Route TT near Ashburn; scheduled to begin Aug. 13; estimated completion: Summer 2012
US 61 – Pavement repair and resurfacing north and southbound lanes from just north of Route OO to Route B; paving to begin week of Aug. 13; one lane traffic during working hours; estimated completion: July 2012
Maintenance
Route WW – Aug. 13 one lane traffic 7 a.m.- 4 p.m. for pavement repairs from US 61 to Route D
Route OO – Aug. 14 one lane traffic 7 a.m- 4 p.m. for pavement repairs from US 61 to End of State Maintenance
Route FF – Aug. 14 one lane traffic 7 a.m. – 4 p.m. for pavement repairs from US 61 to End of State Maintenance
US 61 service roads – Aug. 15 one lane traffic 7 a.m. – 4 p.m. for pavement repairs between Bowling Green and Frankford
US 54 – Aug. 20-30 one lane traffic with 10 ft. width restriction for bridge inspections and preventative maintenance on the Champ Clark Bridge over the Mississippi River at Louisiana; crews working Mon. – Thurs. 8 a.m. – 4 p.m. daily
Various Routes – Aug. 13-24 possible intermittent lane closures or slow moving vehicles blocking driving lane for surface and/or roadside maintenance operations in various locations.
Ralls County
Construction
MO 19 – Resurface from US 61 near New London to just north of Laddonia at Route J; scheduled to begin Aug. 13; cold milling operations for bonded concrete intersection at Rte. 19 & Rte. H/P in Center; Routes H and P will be closed at Rte. 19 for 14 days. estimated completion: Summer 2012.
Route T – Resurface from just south of MO 79 to Route N south of Hannibal; 92% complete; shoulders and striping remain; estimated completion: Summer 2012
MO 154 – Resurface from MO 19 to US 54 near Hutchison between Curryville and Vandalia; inactive; estimated completion: Summer 2012
Route E – Seal coat from MO 79 to end of State maintenance near Saverton; scheduled to begin Aug. 13; estimated completion: Summer 2012
Route T – Seal coat from Route N south of Hannibal to MO 79 near Ashburn; scheduled to begin Aug. 13; estimated completion: Summer 2012
Route V – Seal coat from Ralls Street in New London to Route T; scheduled to begin Aug. 13; estimated completion: Summer 2012
Route N – Seal coat from Route T to MO 79 near Saverton; scheduled to begin Aug. 13; estimated completion: Summer 2012
Maintenance
MO 19 – Aug. 13 one lane traffic 7 a.m. – 4:30 p.m. for pavement repairs on bridge deck on Gallaher Creek Bridge just south of Route EE
Route J – Aug. 13 one lane traffic 7 a.m. – 4:30 p.m. for pavement repairs on bridge deck over the Norfolk Southern Railroad east of Monroe City near Hassard
Route E – Aug. 20-21 one lane traffic 7 a.m. – 4:30 p.m. for ditching and culvert work from MO 79 to End of State Maintenance
Route T – Aug. 22-23 one lane traffic 7 a.m. – 4:30 p.m. for ditching and culvert work from Route V to MO 79
Various Routes – Aug. 13-24 possible intermittent lane closures or slow moving vehicles blocking driving lane for surface and/or roadside maintenance operations in various locations

Posted on Wednesday, August 15, 2012 at 9:11 am