Spencer Creek bridge reopens on March 24

MoDOTOn Monday, March 24, US 154 between Curryville and MO 19 will reopen to traffic after being closed almost a month and a half to redeck the Spencer Creek Bridge.
The contractor plans to open the bridge, located just east of Route P and west of Blue Jay Road, by noon on Monday the 24th. The deck and side barriers on the 65-year-old bridge were removed all the way down to steel and replaced with a new deck which is 22 foot wide compared to the old 20 foot deck.
MoDOT would like to thank area residents for their patience during construction.

Posted on Wednesday, March 19, 2014 at 4:20 pm