Spencer Creek bridge reopens on March 24

Posted on Wednesday, March 19, 2014 at 4:20 pm

MoDOTOn Monday, March 24, US 154 between Curryville and MO 19 will reopen to traffic after being closed almost a month and a half to redeck the Spencer Creek Bridge.
The contractor plans to open the bridge, located just east of Route P and west of Blue Jay Road, by noon on Monday the 24th. The deck and side barriers on the 65-year-old bridge were removed all the way down to steel and replaced with a new deck which is 22 foot wide compared to the old 20 foot deck.
MoDOT would like to thank area residents for their patience during construction.

Headlines of the Day