MoDOT Weekly Report

Posted on Wednesday, November 20, 2013 at 1:10 pm

MoDOTNovember 18-29
Audrain Co.
Construction
MO 15 – Chip seal from MO 154 to just north of MO 22; Inactive until spring/summer 2014: Estimated Completion: Fall 2014.
Maintenance
MO 22 – Nov. 18-21 periodic lane closures in Mexico 9 am – 4 p.m. at locations between 0.20 mile after Morris Street to MO 15; center lane may be closed or a portion of one of the through lanes for sewer work performed by City of Mexico crews
Various Routes -Nov. 18-29 possible intermittent lane closures or slow moving vehicles blocking driving lane for surface and/or roadside maintenance operations in various locations.
Montgomery Co.
Construction
I-70 Mineola Truck Parking Facility – Grading and paving for improvement / expansion of truck parking facility; Project Status: Inactive until spring/summer 2014; Estimated Completion: Fall 2014
Maintenance
Route F – Nov. 18 – Road closed 7 a.m. to 3 p.m. for culvert replacement from Groeber Road to Route JJ; please use alternate route during this time.
Route F – Nov. 19 – Road closed 7 a.m. to 3 p.m. for culvert replacement from Davis Road to Route V; please use alternate route during this time.
Various Routes -Nov. 18-29 possible intermittent lane closures or slow moving vehicles blocking driving lane for surface and/or roadside maintenance operations in various locations.
Pike Co.
Maintenance
Various Routes -Nov. 18-29 possible intermittent lane closures or slow moving vehicles blocking driving lane for surface and/or roadside maintenance operations in various locations.
Ralls Co.
Construction
Route J – Preventative maintenance on Mark Twain Lake bridges over the Cannon Reservoir and Lick Creek; substructure repairs and modifications, expansion joint replacement, removal and replacement of asphalt surface and upgrading the existing guardrail. Lick Creek Bridge (just west of Route EE) one lane traffic; Road Closed 3 miles north of Perry at Lick Creek November 13-December 2. Estimated Completion: Fall 2013; Macon Project Office
Maintenance
Route B – Nov. 19 – road closed 8 a.m. to 2:30 p.m. for culvert replacement from Salling to Martin Street in Perry; please use alternate route during this time.
Route K – Nov. 20 – road closed 8 a.m. to 2:30 p.m. for culvert replacement from just east of MO 19 to Carter Road; please use alternate route during this time.
Route H – Nov. 22 – one lane traffic 8 a.m. to 2:30 p.m. for culvert replacement on Big Creek Lane in Rensselaer; traffic will be one lane on Route H, however there will be no access to Big Creek Lane from Route H during this time.
Various Routes -Nov. 18-29 possible intermittent lane closures or slow moving vehicles blocking driving lane for surface and/or roadside maintenance operations in various locations.